|
The Breda-Cimimontubi SMS cluster was the first of two productive clusters created through the Planning Agreement for the Reindustrialization of the Sesto San Giovanni area. The cluster, that has 25 small and medium size enterprises was built on part of the redundant Breda-Cimimontubi area of Sesto San Giovanni. Situated between via Carducci and via Milanese it has a surface area of 12,900 square metres and is subdivided into lots of from 200 to 1,000 square metres.
The enterprises were selected through a public competition in 1998 and began occupying the new spaces in 2002. The construction of the cluster was managed by the enterprises themselves through the creation of the ex-Breda-Cimimontubi Productive Cluster Cooperative.
The Agency supported the cooperative during all of its operational phases and it coordinated all of the financing tools for the creation of the district, (like the Regional Law 30 of 1994 and the contribution given by the Labour Ministry as part of its Development Funds Program, Law 236 of 1993).
The Breda-Cimimontubi SME cluster supplied the 25 enterprises not only with laboratories and spaces planned for their specific needs
but also with interesting perspectives for their development; the latter is shown by the employment increase registered and the investments made. During the initial moving phase, the enterprises employed 157 people, of which 51 were recently hired.
The total investment involved in the buying of the area, its planning, and construction was 10.5 million Euros; investments for the equipping of the buildings is not included in this figure.
| Construction phases |
February 1998
|
Publication of the competition to assign productive lots. |
March 1998
|
Reclaiming and surveying work begins in the area. |
| April 1998 |
Selection of the 25 enterprises assigned to the lots from the 57 applicants. |
| December 1998 |
Forming of the Cooperative of the ex-Breda-Cimimontubi cluster area. |
| February 1999 |
Milano Metropoli purchases the area concerned from the Breda-Cimimontubi company. |
| December 1999 |
Sale of the area to the cooperative of enterprises at a set price of 110.00 Euros per square metres. |
| June 2000 |
Construction work starts on the cluster. |
| January 2002 |
Enterprises begin to occupy the space. |
| March 2002 |
Institutional inauguration of the cluster. |
|
|
Enterprises
Allcom
Manutenzione impianti informatici

BMS Italia
Servizi ambientali pulizia

Coel Distribution
Materiale per trasmissione dati

Coffee Time
Manutenzione impianti distribuzione bevande

Dalflex
Tapparelle, tende, porte

Devicar
Officina meccanica

ER-GA
Commercializzazione nastri adesivi

F.I.M.O.
Forni per fusioni metalliche

F.lli Carubelli
Riparazione e manutenzione macchine

Farti
Guarnizioni industriali

Ghidelli
Accollatario servizi postali

GLM
Impianti elettromedicali

Igema
Allestimenti impianti scenografici

La Meta
Produzione cornici

M.A.C.R.I.
Sistemi per automazione

M.E.M.
Meccanica di precisione

Marco Kracht
Coltelleria e minuteria meccaniche

Pedrazzini Alceo Autotrasporti
Autotrasporti

Record
Impianti tecnologici

Romano
Installazione portoni

S.I.RE.L
Soluzioni informatiche e reti locali

Sadema
Testaletto per ospedali e case di cura

Shi-Core
Produzione e sviluppo software

UCS
Stampi materie plastiche

VI & VI Elettronica
Circuiti stampati per elettronica
|